(512) Brew News


More Progress… by Kevin - Owner/Brewer
February 2, 2008, 11:34 pm
Filed under: Brewery Floor, Uncategorized

The grist case is ready to flip and place in its newly formed stand. This stainless steel hopper will be used to store the freshly milled grain just before brew day. My neighbor is an amazing metal fabricator and he whipped out this stand today! I can’t wait to see it filled with 2000 pounds of cracked malted barley….

case-upside-down.jpggrist-case-stand.jpg

We’ve also been busy running the chiller piping to the fermenters and cold liquor tank. This pipe will run chilled propylene glycol to the tank jackets enabling fine tuned temperature control over the contents during fermentation.

chiller-lines.jpg

On top of all this, the logo on the wall is finished….looking good! 

logo.jpg512-painting.jpg

Advertisements

Leave a Comment so far
Leave a comment



Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s



%d bloggers like this: