Friday there was nothing. By Monday lunchtime the walls were up! What a crew! With the design tweaked to perfection, the team plowed through each of 17 walls with little hesitation and minimal head scratching.

Day 1 produced the office…

wall-crew.jpgfirst-wall.jpgday-1.jpg

Day 2 yielded the cold room (double walls) and the restroom….

cold-room.jpgnearly-dark-day-2.jpg

Half of Day 3 with half the crew back to their day jobs, the grain room was complete…

walls-complete.jpg

Lunch at a Opal’s Penn Field with great beer (37 handles) made each afternoon that much better.

Next up the deck, then electrical, insulation, dry wall and concrete backfill. We’d better hurry. Word is the Brewhouse is just 4 weeks away from arrival and the boiler and chiller ship even sooner!!!

Advertisements

Leave a Comment so far
Leave a comment



Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s



%d bloggers like this: